My Report

Civil Engineering Drawing Practice Test 6


Correct Answer: 2 points | Wrong: -1 point
Grades: A* (100% score) | A (80%-99%) | B (60%-80%) | C (40%-60%) | D (0%-40%)
advertisement

1. __________ is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality.

2. ___________ of building is the useful area or liveable area or lettable area. This is the total floor area minus the circulation area, verandahs, corridors, passages, staircase, lifts, entrance hall, etc. minus other non-useable areas.

3. ________________ is the amount provided in the estimate and bill of quantities for some specialised work to be done by a specialised firm; whose details are not known at the time of preparing estimate.

4. Heat resistant plaster is a building material used for coating walls and chimney breasts.

5. Bullock cart can carry a load of ¾ to 1 tonne depending on the type of materials and the nature of road.

6. Laying of pipes shall proceed up grade of slopes. The error of grade shall not be rectified by packing up earth underneath the pipes.

7. The approximate cost of a building of cubic content of 400 cu m@ Rs.180/- per cu m is __________

8. The quantity of cement concrete may be calculated by multiplying the area of floor by the thickness.

9. The term ______________ is used to denote a procedure of costing or valuing an item of work on the basis of actual labourers and materials required.

10. The maximum distance between manholes shall be 30 meter unless specially permitted otherwise.


 

Manish Bhojasia - Founder & CTO at Sanfoundry