My Report

Hazardous Waste Management Practice Test 3


Correct Answer: 2 points | Wrong: -1 point
Grades: A* (100% score) | A (80%-99%) | B (60%-80%) | C (40%-60%) | D (0%-40%)
advertisement

1. The Emergency Response and Removal Program was developed to _________

2. ____________ defines type of response for the clean up.

3. The final rule of import-export gives more transparency in tracking.

4. RCRA permits require facilities to develop emergency plans.

5. According to TSCA a chemical substance maybe __________

6. Solidification of HW is done at TSDF to reduce ________

7. SARA legislation was passed after two years of the Bhopal incident.

8. Chemicals substances on the Inventory include pesticides.

9. Immediate removal should be completed within __________

10. Which of the following hazardous waste is produced from the production of mineral acids?


 

Manish Bhojasia - Founder & CTO at Sanfoundry
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.

Subscribe to his free Masterclasses at Youtube & discussions at Telegram SanfoundryClasses.