My Report

Irrigation Engineering Practice Test 3


Correct Answer: 2 points | Wrong: -1 point
Grades: A* (100% score) | A (80%-99%) | B (60%-80%) | C (40%-60%) | D (0%-40%)
advertisement

1. A lined canal costs about 2 to 2.5 times as much as the unlined canal.

2. Safety ladders are provided in large irrigation canals to ______________

3. The land is made to be sloped towards the ditches.

4. The berms help in checking excessive loss of water due to seepage.

5. Which factor causing waterlogging suggests extensive irrigation?

6. Which factor comes into play when less permeable substratum is present?

7. According to Kennedy the silting action in channels is due to?

8. Which type of lining is restricted to the availability of suitable soils in the area?

9. Which of the following statement is wrong?

10. What type of losses can be mainly avoided by lining the canals?


 

Manish Bhojasia - Founder & CTO at Sanfoundry
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.

Subscribe to his free Masterclasses at Youtube & discussions at Telegram SanfoundryClasses.