1. The process of distribution of water from main canal to branches is termed as canal regulation.

2. How many types of canal irrigation works are there?

3. What type of fall does diagram represent?
irrigation-engineering-questions-answers-types-falls-q5

4. The width provided at the site for the river to flow and also the length of the weir is ____________

5. Canal drop or canal fall is needed construction in the canal bed.

6. In case of design of sarda type fall the length of crest is kept equal to ____________

7. In what intervals the top width of the notch lies?

8. The Ganges Treaty between India and Bangladesh is an agreement to share surface waters at the ___________

9. In case of breaches in the canal, the escape present in the upstream of the breach is opened.

10. The safety of a hydraulic structure founded on a pervious foundation can be ensured by:
i. Provision sufficient length of its concrete floor.
ii. Providing sufficient depth of its concrete floor.
iii. Provision a downstream cutoff of some reasonable depth.


 

Manish Bhojasia - Founder & CTO at Sanfoundry
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.

Subscribe to his free Masterclasses at Youtube & discussions at Telegram SanfoundryClasses.