My Report

Power Plant Engineering Practice Test 3


Correct Answer: 2 points | Wrong: -1 point
Grades: A* (100% score) | A (80%-99%) | B (60%-80%) | C (40%-60%) | D (0%-40%)
advertisement

1. The relation between heat rate & efficiency is?

2. Which of these is not an application of back pressure turbine?

3. What is the location of low pressure heaters?

4. Having two separate units for process heat and power is?

5. What is the exhaust condition of a Watt's Beam Engine?

6. The overall efficiency noverall of a steam power plant is given by?

7. The output of the boiler heat pump is to?

8. Which of the following is a good medium for constant temperature heating?

9. Net positive suction head(NPSH) is provided because?

10. Which of these is not considered economical for cogeneration?


 

Manish Bhojasia - Founder & CTO at Sanfoundry
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.

Subscribe to his free Masterclasses at Youtube & discussions at Telegram SanfoundryClasses.