My Report

Waste Water Engineering Practice Test 6


Correct Answer: 2 points | Wrong: -1 point
Grades: A* (100% score) | A (80%-99%) | B (60%-80%) | C (40%-60%) | D (0%-40%)
advertisement

1. The cyclone gritter removes the grit particles based on which of the below mentioned phenomenon?

2. Large amount of wastewater constantly produced _________ the treatment time of wastewater in a septic tank.

3. The shape of the tank is circular.

4. What is the duration of sludge in tanks for mesophilic anaerobic digestion?

5. Which of the following processes is not used for water reduction?

6. What is the BOD removal level for moving bed bioreactor?

7. What is the temperature that needs to be maintained during the process?

8. Toxic chemicals are removed from liquid sewage by _______

9. What is the solid loading rate in kg/ m2.d considered while designing a thickener to treat the primary sludge?

10. What is the function of two tanks provided in septic tank systems?


 

Manish Bhojasia - Founder & CTO at Sanfoundry
Manish Bhojasia, a technology veteran with 20+ years @ Cisco & Wipro, is Founder and CTO at Sanfoundry. He lives in Bangalore, and focuses on development of Linux Kernel, SAN Technologies, Advanced C, Data Structures & Alogrithms. Stay connected with him at LinkedIn.

Subscribe to his free Masterclasses at Youtube & discussions at Telegram SanfoundryClasses.